|
|
|
|
| LEADER |
00919cam a2200229 7i4500 |
| 001 |
0000034193 |
| 005 |
20170223090000.0 |
| 008 |
110329 eng |
| 020 |
|
|
|a 0838910122
|
| 020 |
|
|
|a 9780838910122 (pbk.)
|
| 090 |
0 |
0 |
|a Z679.2.U6
|b W54 2010
|
| 100 |
1 |
|
|a Woodward, Jeannette
|
| 245 |
1 |
0 |
|a Countdown to a new library :
|b managing the building project
|c Jeannette Woodward.
|
| 250 |
|
|
|a 2nd ed.
|
| 260 |
|
|
|a Chicago:
|b American Library Association,
|c 2010.
|
| 300 |
|
|
|a vii, 272 p.:
|b ill.;
|c 28 cm.
|
| 504 |
|
|
|a Includes bibliographical references and index
|
| 650 |
0 |
0 |
|a Library building --
|x Design and construction --
|z United States
|
| 997 |
|
|
|a Communication, Visual Art & Computing, Faculty
|b Communication, Department
|
| 998 |
|
|
|a Library Science, Diploma
|
| 999 |
|
|
|a 0000047043
|b BOK
|c OPEN SHELF
|e 2nd Floor, Bestari Jaya
|
| 999 |
|
|
|a 0000055725
|b BOK
|c OPEN SHELF
|e 2nd Floor, Bestari Jaya
|