Study of Just in Time system on the manufacturing line at Vermech Tool Engineering

Main Author: Gajendran Thivasalam
Language: English
Published: Bestari Jaya, Selangor: UNISEL, 2007.
Subjects:
LEADER 00926cam a2200217 7i4500
001 0000023779
005 20180420090000.0
008 080827 eng
090 0 0 |a TS1600   |b .G36 2007 
100 0 |a Gajendran Thivasalam  
245 1 0 |a Study of Just in Time system on the manufacturing line at Vermech Tool Engineering   |c Gajendran s/o Thivasalam. 
260 |a Bestari Jaya, Selangor:   |b UNISEL,   |c 2007. 
300 |a vii, 79 p.:   |b ill. (some col.);   |c 30 cm. 
500 |a Please login MyLib (library.unisel.edu.my/web/guest/mylibrary - click eDocument) 
502 |a Thesis (Bachelor of Engineering-Mechanical), UNISEL, 2007 
610 2 |a Universiti Industri Selangor  
650 0 0 |a Dissertation, Academic  
650 0 0 |a Just in Time (JIT) system  
997 |a Engineering, Faculty  |b Engineering, Department 
998 |a Mechanical Engineering, Degree 
999 |a THE0000452  |b THESIS  |c THESIS  |e Thesis Room, Bestari Jaya