|
|
|
|
LEADER |
00748cam a2200193 7i4500 |
001 |
0000023777 |
005 |
20101014090000.0 |
008 |
080827 eng |
090 |
0 |
0 |
|a HE373
|b .L44 2007
|
100 |
3 |
|
|a Lee, Siaw Yian
|
245 |
1 |
0 |
|a Staggered junction :
|b case study at Batang Berjuntai town, Kuala Selangor and Sim Kheng Hong road, Kuching
|c Lee Siaw Yian.
|
260 |
|
|
|a Bestari Jaya, Selangor:
|b UNISEL,
|c 2007.
|
300 |
|
|
|a ix, 64 p.:
|b ill.;
|c 30 cm.
|
502 |
|
|
|a Thesis (Bachelor of Civil Engineering), UNISEL, 2007
|
610 |
2 |
|
|a Universiti Industri Selangor
|
650 |
0 |
0 |
|a Dissertation, Academic
|
650 |
0 |
0 |
|a Traffic safety
|
650 |
0 |
0 |
|a Staggered junction --
|z Malaysia
|
999 |
|
|
|a THE0000421
|b THESIS
|c THESIS
|e Thesis Room, Bestari Jaya
|