|
|
|
|
LEADER |
00765cam a2200217 7i4500 |
001 |
0000021289 |
005 |
20170218090000.0 |
008 |
080325 eng |
020 |
|
|
|a 9780471757276 (hbk.)
|
040 |
|
|
|a DLC
|
090 |
0 |
0 |
|a TS157.5
|b .P76 2007
|
100 |
1 |
|
|a Proud, John F
|
245 |
1 |
0 |
|a Master scheduling :
|b a practical guide to competitive manufacturing
|c John F. Proud.
|
250 |
|
|
|a 3rd ed.
|
260 |
|
|
|a Hoboken, N.J.:
|b John Wiley & Sons, Inc.,
|c 2007.
|
300 |
|
|
|a xxviii, 657 p.:
|b ill.;
|c 24 cm.
|
504 |
|
|
|a Includes bibliographical references and index
|
650 |
0 |
0 |
|a Manufacturing resource planning
|
650 |
0 |
0 |
|a Production scheduling
|
997 |
|
|
|a Business & Accountancy, Faculty
|
999 |
|
|
|a 0000030230
|b BOK
|c OPEN SHELF
|e 2nd Floor, Bestari Jaya
|