|
|
|
|
| LEADER |
00781cam a2200217 7i4500 |
| 001 |
0000020167 |
| 005 |
20190430090000.0 |
| 008 |
080516 eng |
| 020 |
|
|
|a 9780470118825 (hbk.)
|
| 040 |
|
|
|a DLC
|
| 090 |
0 |
0 |
|a HD9685.A2
|b M39 2007
|
| 100 |
1 |
|
|a Mazer, Arthur
|
| 245 |
1 |
0 |
|a Electric power planning for regulated and deregulated markets
|c Arthur Mazer.
|
| 260 |
|
|
|a Hoboken, N.J.:
|b John WIley & Sons:
|b 2007.
|
| 300 |
|
|
|a xix, 313 p.:
|b ill.;
|c 24 cm.
|
| 504 |
|
|
|a Includes bibliographical references and index
|
| 650 |
0 |
0 |
|a Electric utilities --
|x Management
|
| 650 |
0 |
0 |
|a Competition
|
| 650 |
0 |
0 |
|a Risk management
|
| 997 |
|
|
|a Engineering & Life Sciences, Faculty
|b Engineering, Department
|
| 999 |
|
|
|a 0000029953
|b BOK
|c OPEN SHELF
|e 1st Floor, Bestari Jaya
|