|
|
|
|
LEADER |
00764cam a2200205 7i4500 |
001 |
0000013018 |
005 |
20171117090000.0 |
008 |
070815 eng |
020 |
|
|
|a 0074620622 (hbk.)
|
090 |
0 |
0 |
|a TH438.4
|b .C45 1998
|
100 |
1 |
|
|a Chitkara, K K
|
245 |
1 |
0 |
|a Construction project management :
|b planning, scheduling and controlling
|c K K Chitkara.
|
260 |
|
|
|a New Delhi:
|b Tata McGraw-Hill Pub. Co.,
|c 1998.
|
300 |
|
|
|a xviii, 558 p.:
|b ill.;
|c 24 cm.
|
504 |
|
|
|a Includes bibliographical references and index
|
650 |
0 |
0 |
|a Planning
|
650 |
0 |
0 |
|a Production scheduling
|
650 |
0 |
0 |
|a Construction industry
|
997 |
|
|
|a Engineering & Life Sciences, Faculty
|b Engineering, Department
|
999 |
|
|
|a 0000019584
|b BOK
|c OPEN SHELF
|e 2nd Floor, Bestari Jaya
|