|
|
|
|
| LEADER |
00781cam a2200229 7i4500 |
| 001 |
0000011606 |
| 005 |
20171117090000.0 |
| 020 |
|
|
|a 0766828611 (pbk.)
|
| 020 |
|
|
|a 9780766828612 (pbk.)
|
| 090 |
0 |
0 |
|a TH438.4
|b .M36 2003
|
| 100 |
1 |
|
|a Marchman, David A
|
| 245 |
1 |
0 |
|a Construction scheduling with primavera enterprise
|c David A. Marchman and Terry L. Anderson.
|
| 250 |
|
|
|a 2nd ed.
|
| 260 |
|
|
|a New York:
|b Thomson/ Delmar Learning,
|c 2003.
|
| 300 |
|
|
|a xiii, 375 p.:
|b ill.;
|c 28 cm.
|
| 500 |
|
|
|a Includes index
|
| 650 |
0 |
0 |
|a Primavera enterprise
|
| 650 |
0 |
0 |
|a Production scheduling
|
| 650 |
0 |
0 |
|a Building
|
| 700 |
1 |
|
|a Anderson, Terry L
|
| 997 |
|
|
|a Engineering & Life Sciences, Faculty
|b Engineering, Department
|
| 999 |
|
|
|a 0000014919
|b BOK
|c OPEN SHELF
|e 2nd Floor, Bestari Jaya
|